Projects/Overview
Open issues4.2%
251
active queue
In progress2%
111
wip
Sprint commitment592 pts
640 pts
Sprint 42
Velocity (6-sprint)3 pts
40 pts
mean completed
Blockedwatch
32
need unblock
Carry-over forecast95% risk
22 pts
slip predictor
If DATA-904 stays blocked

Carry forecast rises from 14 → 24 pts (+71%). Warehouse cutover epic (DATA-E2) misses its W8 window, pushing 2 downstream epics. Recommended: split the remaining 10 pts. Backfill path (5 pts, Noah P.) can start unblocked.

Slip predictor Roadmap
Capacity for MOB-611 (8 pts)

Sasha K. owns offline mode but is at 8/8 pts. Theo B. has 2 pts free this sprint and paired on the sync layer in Sprint 40. Best fit: keep Sasha as reviewer, assign Theo as primary with a 2-day handoff.

Team load
Scope creep · week 32

6 pts added mid-sprint (MOB-611, INV-1211, CORE-1910), all pulled from triage, none swapped out. That's the 4th consecutive sprint ≥ 5 pts of adds. Guardrail suggestion: cap scope-adds at 4 pts or require a swap-out.

Sprints Backlog

Throughput vs commitment

Product Engineering · weekly

Completed ptsCommitted
013253851W1W2W3W4W5W6W7W8W9W10W11W12
W3 Checkout v3 beta freezeW5 Auth MFA GA targetW8 Warehouse cutover windowW10 Mobile offline alpha

Issues by status

340 total

48
Backlog
60
Todo
59
In Progress
52
In Review
32
Blocked
89
Done

Highest carry risk

Slip predictor

KeyIssueSlip
INV-1123Fix auth middleware86%
DATA-904Warehouse cutover blocked on legacy CDC lag74%
CHK-1253Ship billing hook68%
CORE-1141Remove webhook handler64%
MOB-1149Triage admin console64%
CORE-1242Fix CI gate60%
MOB-1199Investigate tax adapter56%

Top open issues

by priority · points

Board
KeyTitleStatusPriPtsOwner
DATA-904Warehouse cutover blocked on legacy CDC lagBlockedP013Eli
INV-1057Remove retry queueTodoP013Eli
CHK-1111Wire inventory deltaIn ReviewP013Eli
INV-1123Fix auth middlewareBlockedP013Eli
CHK-1156Optimize cache layerIn ProgressP013Noah
INV-1195Ship webhook handlerIn ProgressP013Mira
MOB-1232Triage dead-letter pathBacklogP013Sasha
INV-1243Investigate metrics panelIn ReviewP013Eli

Sprint health

Sprint 42

20%
health
Done / committed0 / 640 pts
Progress0%
Carry forecast22 pts
High slip (≥55%)7 issues

Root-caused alerts

symptom → cause → fix

Do this next

scored from slip · impact × carry risk

Slip
#1559
Unblock INV-1123
Blocked: Flaky CI blocking merge
13 pts at stake
#2481
Unblock DATA-904
Blocked: CDC lag > 4h on legacy cluster
13 pts at stake
#3272
Unblock CHK-1253
Blocked: Needs design sign-off
8 pts at stake
#4416
Unblock CORE-1141
Blocked: Flaky CI blocking merge
13 pts at stake