Assets12
320
active register
Open WOs8
206
active pipeline
PM overdue5
48
compliance risk
Risk exposurewatch
$9.01M
failure $ board
Uptime0.4
99%
fleet 30d proxy
PM complianceflat
73.3%
on-time schedules
Uptime % vs downtime hours
Northline assets · weekly
Uptime %DT hours
W2 Plant East PM waveW4 Conveyor bearing campaignW7 HVAC peak-load outageW10 Forklift meter PM burst
Assets by status
320 assets
177
Online
72
Degraded
42
Down
20
Offline
9
Retired
Down / degraded
need attention
| Code | Status | WOs |
|---|---|---|
| CNV-04 | Degraded | 3 |
| FLT-12 | Degraded | 2 |
| SMT-RF3 | Down | 2 |
| DOCK-E3 | Degraded | 1 |
| BOIL-E1 | Degraded | 2 |
| BELT-493 | Degraded | 0 |
| FLT-648 | Degraded | 2 |
Highest failure risk $
replacement × fail prob × crit
| Asset | Name | Crit | Score | Risk $ |
|---|---|---|---|---|
| CNV-04 | Main conveyor line 4 | A | 71 | $249K |
| PUMP-964 | Plant lift 18 | A | 55 | $188K |
| SMT-RF3 | Reflow oven zone 3 | A | 75 | $172K |
| XFMR-608 | West handler 38 | A | 54 | $139K |
| FLT-835 | Main valve 26 | A | 59 | $132K |
| DOCK-372 | Bay rack 14 | A | 53 | $128K |
| SRV-861 | Secondary leveler 6 | A | 47 | $127K |
| TANK-465 | Field panel 22 | A | 45 | $122K |
Fleet health
170 elevated risk · 48 PM OD
99
uptime
Open WOs206
PM compliance73.3%
Risk exposure$9.01M
Down / degraded114
Root-caused alerts
symptom → cause → fix
Do this next
scored from risk $ + open DT + PM lag
#196
Recover SMT-RF3 heater circuit
Emergency WO-19062 · 28h DT
$62K at stake
#291
Close CNV-04 bearing WO + PM
Top failure risk $
$249K at stake
#384
Clear A-class PM backlog
48 overdue · sim crew
$423K at stake
#476
Release FLT-12 meter PM
96% threshold · battery hold
$12K at stake